Dubai UAE
+971503524688
info@apstllc.com apstllc@gmail.com

Projects

 PROJECT EXECUTED IN UAE  2011-2019 
 LIST OF PUMPS                             
Sr NoScope of WorkClient/Consultant/ContractorProjectProduct
1Supply Fuel Transfer Pump & Fabrication of TanksEMARATEMARAT Liquefied Tankage Terminal  Abu DhabiF E Petro Pumps
2Supply and Commissioning of  1Duty + 1 Standby Water Booster Pump Set & Transfer setPoineer / Bin Saleh ContractingG+3P+10 +HCGrundfos Pumps 
3Supply and Commisioning of 1 set of (1Duty+Standby) Water Booster Pump Set, 12.5kW Model V40-40/16Client – Bay Gate LLC                                                   Main Contractor – ANC35 Storey Bay Gate Office TowerGrundfos Pump / CMS Pompe Italy
4Supply and Commisioning of 1 set of (1Duty+Standby) Water Booster Pump Set, 5.5kW Model V40-40/12Main Contractor – ANC18 Storey Tecom Investment Tower (Al Barsha)CMS Pompe Italy
5Supply and Commisioning of 1no of (1Duty+1Standby) Water Transfer Pump Set , V 40-40/5 and (1Duty/1Standby) Water Booster Pump Set , 1HP V 40-13/3 Client – RTA                                                                     MEP Contractor – MACAIR LLC      Consultant – Art Consultant                                                               Contractor – Construction & Building Engg.Intelligent Transportation System (ITS) DeiraCMS Pompe Italy
6Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsAl Dana Engg / Airtechnic LLCB+G+12+GYM Blg.On Plot No 232-549 At Al QusaisGrundfos Pumps 
7Supply and Commisioning of 1Duty+1Standby  Irrigation Water Booster Pump Set,Engineers Office/ Green Scapes Landscape ContractingG+ 4 Media Building-New Camel race at LisailiKSB Pumps Germany
8Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsYousuf & Anan Cont.co./ Al Shurooq2B+G+11Floor Building @ Plot#373-1247 Al Barsha-1Victor Pumps Italy
9Supply and Commisioning of 150 nos Water Booster & Transfer Set. of 1HP V 30-13/3 Pump  2 nos of 1.5HP SXM 13/3B Pump  & 12 nos of 1HP V 40-13/3 PumpRed Sea Housing Services CompanyQatar SheelCMS Pompe Italy
10Supply , Installation, Testing and Commisioning of 3 nos. 30kW Horizontal Centrifugal Pumps with capacity of 150m³/hr @ 50 meter head. Model: SN3NR80-200 GEMAAR Properties Sewage Treatment Plant at SpringsRovatti Pompe Italy
11Supply, Installation, Testing and Commisioning of 2 nos. of 15kW Horizontal Centrifugal Pump with capacity of 180 m³/hr @ 11 meter head and 2 nos. of 1.5Hp submersible pumps with capacity of 7.8 m³/hr @ 25 meter head ( Including Piping)CSEM – UAESolar Islands in Ras Al KhaimahRovatti Pompe Italy
12Supply and Commisioning of  1Duty + 1 Standby Water Booster Pump SetGreen Scapes Landscape Contracting / Nature landscape LLCAl Barari dev ph 1 zone 1 model villa b4Grundfos Pumps 
13Supply and Commisioning of  1Duty + 1 Standby Water Booster Pump SetAl Mahara Cont / Design & Build Project llcAl Mahara con &gen maintGrundfos Pumps 
14Supply and Commisioning of  1Duty + 1 StandbyWater Booster Pump SetSynergy Vortex Cont/Design & Build Project llcLion cages-Nakhali state temporaryGrundfos Pumps 
15Supply and Commisioning of 1Duty + 1 StandbyWater Booster Pump SetSmart contractingShopping Complex in SharjahGrundfos Pumps 
16Supply and Commisioning of 4 Nos of (1Duty) Complete Stainless Steel Water Booster Pump Set, 7.5HP CRE 30/3 and 15HP -CR 30/3Al Madina Purification of Portable Water LLCMiniral Water PlantGrundfos Pumps 
17Supply and Commisioning of 2 nos of 4HP CM 40-160B Pump, 1 no of 1HP 4PS100 Pump ,2 nos of 4HP CM 40-125C PumpJSS Air Conditioning and Refn.Chilled Water Circulation Plant for Platinium ProjectMatra Pump Italy
18Supply and Commisioning of 1 no of 7.5HP V 50-24/6 Pump, 2 nos of 5.5kW V-50-24/6 PumpEmirates Refining Co. Ltd.ENG. CAPITAL FILLINGCMS Pompe Italy
19Supply of 6 nos. 5.5kW CMS Vertical Multistage pump (V-50-24/6)Emirates Refining Co. Ltd.ENG. CAPITAL FILLINGCMS Pompe Italy
20Supply and Commisioning of 3Duty+1Standby  Chilled Water PumpHEAC Systems LLC/ Arif &BintoakG+1 Boys School (cycle-1) At plot no.891-507, Hatta DubaiWilo Pump Germany
21Supply and Commisioning of 1 no of 15HP VE-60/3 PumpCarolina FabricsDenim Plant in Jebel AliCMS Pompe Italy
22Supply and Commisioning of 2 nos VMS 32-40 PumpCarolina FabricsDenim Plant in Jebel AliMatra Pump Italy
23Supply and Commisioning of 12 Lit/sec @ 40m Water Booster Pump, Composed of 3 nos. 15HP Vertical multististage pump from CMS, Model : VE-42/4Power Steel Contracting LLCBuilding Construction in Ras Al KhaimahCMS Pompe Italy
24Supply, Installation and Commisioning/Piping of 2 nos. 30 kW Horizontal centrifugal pump with capacity of 100 m³/hr @ 60 m headEMAAR PropertiesDubai Marina Chilled Water Circulating Plant  Rovatti Pompe Italy
25Supply, Installation and Commisioning of 2 nos. 15Hp SS304 Submersible Bore Well Centrifugal pump EMAAR Properties9VV Marina Tower Chilled Water Circulating Plant  CMS Pompe Italy + Sumoto Motors Italy
26Supply, Commisioning of Water Booster Pump Set 1 no 0.35Kw Vertical Multistage Centrifugal pump Client – RTA                                         Main Contractor – Wade Adam Contracting      Consultant – Parsons                R777/4A Dubia Creek Crossing   Grundfos Pumps 
27Supply, Installation and Commisioning of 2 nos. 30KW Water Transfer Vertical Multistage Centrifugal pump Set Model – ME60KV80-60/4T Arabtec Construction LLCInifinity Tower DubaiRovatti Pompe Italy
28Supply, Installation and Commisioning of 1 no. 37KW Water Booster Vertical Multistage Centrifugal pump Set Model – CR 64-7-2 Arabtec Construction LLCOcean Height DubaiGrundfos Pumps 
31Supply of 2 nos. 30kW End Suction Horizontal Pump MA 80-200BEmirates Refining Co. Ltd.Chilled Water Circulation Plant Matra Pump Italy
32Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set  & Submersible Drainage PumpsAl Wasal Al Jadeed / Vali ElectromechanicalJabel Ali Emarat Filling stationESPA Pumps Spain
33Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsAL Ittihad Electric co LLCB+G+5 R office building on plot no.129-454 at port saeed dxbKSB Pumps 
34Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsParadise palace/ Artica ArchitectsG+M+3 BuildingGrundfos Pumps 
35Supply and Commisioning of 1Duty+1Standby  Irrigation Water Booster Pump Set,Green Scapes Landscape & Maintenance Contracting / Khatib &AlamiUptown Midriff Neighbourhood ParkGrundfos Pumps 
36Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsFour Star ElectromechanicalB+G+4 Gym, Comm &Residential bld @Al NahdaGrundfos Pumps 
37Supply and Commisioning of 1Duty+1Standby  Water Booster Pump SetAlka Cont/Bin dalmouk EngineeringG+1 Villa at plot no.244-138 in muhaisnahKSB Pumps Germany
38Supply and Commisioning of 1Duty+1Standby  Chilled  Pump SetTec ton Engineering &Construction LLC8M06Mineral Water Bottling PlantGrundfos Pumps 
39Supply and Commisioning of 1Duty+1Standby  Water Booster Pump SetFour Star Electromechanically/Consult MaunsellPond Park Al QuasisKSB Pumps Germany
40Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetAl Sabbah Electro-Mech.Cont.Est.PPV009 Villa For Saif Al Kaabi@AlanKSB Pumps Germany
41Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsGreen Scapes Landscape & Maintenance ContractingG+6+22 Regal Tower BARSHAGrundfos Pumps 
42Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetVali ElectromechanicalTexas Chicken and Burger KingWilo Pump Germany
43Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage Pumps New Arch Consultants/Vali Contracting LLCG+4 Labour Accommodation On Plot No 599-2017 Jebal AliGrundfos Pumps 
44Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump Set Al Burj Engineering Consultants/Solanki Construction Co.LLCB+G+7 Floors Building At BarshaGrundfos Pumps 
45Supply and Commisioning of 1Duty+1Standby  Chilled Water Pump Set ArchiconEngineering Consultants/Bin Lahej Electromechanical Ground + 1 Floor Villa At Umm Suqeim FirstWilo Pump Germany
46Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetArchiconEngineering Consultants/Bin Lahej Electromechanical / Basement + Gr.+1 Floor Villa At MamzarWilo Pump Germany
47Supply and Commisioning of 1Duty+1Standby  Chilled Water Pump SetAl Burj Engineering Consultants/Alka Contracting Co LLCBuilding Complex For Fishermen AssociationGrundfos Pumps 
48Supply and Commisioning of 24 nos 1Duty  Water Booster & Transfer Pump SetMillenium Project Management & Engineering/Vali Contracting LLC Millenium VillasGrundfos Pumps 
49Supply and Commisioning of 1Duty+1Standby  Water Booster Pump SetTransco Consultancy/Tecton Engineering & Construction LLC / Mirfa/ Madin Pumping StationKSB Pumps 
50Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump Set National Engr Bureau/Dar Al Emarat/G+5 Residential Building KSB Pumps
51Supply and Commisioning of 1Duty+1Standby  Water Booster Pump SetNaga Architect Planners/Absoulte Middle Esat ElectromechVilla for Al Ghurair (Khawaneej)KSB PUMPS
52Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetDubarch Consultant/Eminent Cont G+4 Residential Building MuraqabatKSB PUMPS
53Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetConsult Maunsell/Arco General Cont/ Abuhail Sport ParkGrundfos Pumps 
54Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsEng Adnan Saffaranni Engg Consultancy /Zahrat AL Safa Gen Cont/B+G+14 Trpical + Health Club Residential bld at BarshaKSB Pumps 
55Supply and Commisioning of Chilled  Water Pump SetEng Adnan Saffaranni Engg Consultancy /Zahrat AL Safa Gen Cont/B+G+14 Trpical + Health Club Residential bld at BarshaKSB Pumps 
56Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set AL Hawraa Eng/Impact Electromechanical Services LLC/Al Hawraa EngrGrundfos Pumps 
57Supply and Commisioning of 1Duty Water Booster Pump Set Rootage Arch/Catic Co/91 Villas Midtown AbudhabiEspa Pumps 
58Supply and Commisioning of 4 Chilled Water Pump Ian Banham Associates/Power Point LLC/4B+G+44 Storey Resi Bld At Jumeirah Lake TowerKSB Pumps
59Supply and Commisioning of 1Duty+1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsArenco Archiecture/Chase Cont/ G+6 Commercial Bld At Investment Park KSB Pumps 
61Supply and Commisioning of Chilled  Water Pump Set  & Pressurisation Set Arif & Bintoak /HEAC Systems/Al Tayer Motors  Showroom KSB Pump 
62Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump Set IAN Banham & Associates /Geco Mechanical & Electrical Cont /Easy Hotel At JafzaGrundfos Pumps 
63Supply and Commisioning  46 nos of 1Duty Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsBoogertman + Partners Consultants/Alka Contracting Co LLC / Sundails Villa At Jumeirah VillageEbara Pump 
64Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump Set ArchiconEngineering Consultants/Bin Lahej Electromechanical /Basement + Gr.+1 Floor Villa At MamzarWilo Pump Germany
66Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage Pumps New Arch Consultants/Vali Contracting LLC/G+4 Labour Accommodation On Plot No 599-2017 Jebal AliGrundfos Pumps 
67Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsJAMS Groups/Orbit Eng Consultants/JAMS Contracting LLCG+M Clinic on Plot No S21301A Jebal ALI Grundfos Pumps 
68Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set, Transfer Set , Filteration Pumpset& Submersible Drainage & Sewage  PumpsetsPolice Project Committee (Secure)/ Bainona Consulting Engineering /Al Eslah Gen Cont ESTAl Saneya Police Station Al AinKSB Pumps
6920 Nos Submersible Deep well Pumps Wade Adams Contracting LLCDIP Shakti Pumps
70Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetCommodore Contracting LLCFujierah Commercial ComplexCrane Pumps 
71Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetTasameen STXG+22 Resi Building Rawdat Plot no C89/C77Crane Pumps
72Supply and Commisioning of 1Duty+1Standby  Water Booster & Transfer Pump SetAl Rayan Cont22 Villas Various Site Ebara Pumps 
73Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set, Transfer Set & Submersible Drainage PumpsEO/Local Engg Office/Serene ContB+G+17+GYM Commercial /Resi Bldg Plot No 392-485 Dubai MarinaKSB Pumps
74Supply and Commisioning of 1Duty/1Standby  Sewage  PumpsetsSeha/ Architectural and Planing Group/Elenco / Long Term Custodian Center Abu Dhabi Ebara Pumps 
75Supply and Commisioning of 2Duty/1Standby  Water Booster Pump Set, 1Duty/ 1Standby Transfer Set & Submersible Drainage PumpsFuture School/Architectural and Engg Consultant / Sepal Contracting/Al Sabbah EMWAl Rawafad School / Abu DhabiLowara Pumps 
76Supply and Commisioning of 3Duty/3Standby  Chilled Water  Pump Set, 1Duty /1Standby Pressurization Unit Future School/Architectural and Engg Consultant / Sepal Contracting/Al Sabbah EMWAl Rawafad School / Abu DhabiEbara Pumps 
77Supply and Commisioning of 2Duty/1Standby  Water Booster Pump Set, 4 SetsAdnoc/Al Thorath Engg Consultancy – Hall & Dolphin JV/Al Sabbah EMWAdnoc Vehical Inspection Center/ Abu Dhabi- Al AinLowara Pumps 
78Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set,4 sets  1Duty/ 1Standby Transfer Set & Submersible Drainage PumpsPluto Electromechnical/ Al Gurg/ Team Engg EnterprisesAjman University & Technology Crane Pumps
79Supply and Commisioning of 3Duty/3Standby  Chilled Water  PumpsetsPolice Project Committee ( Secure)/Architectural and Planing Group /Elenco Abu Dhabi Police HQEbara Pumps 
80Supply and Commisioning of 1Duty/1Standby  Sewage  PumpsetsNBAD/ Dhabi Contracting/Elenco NBAD Capital Centre AdnecEbara Pumps 
81Supply and Commisioning of 3Duty/3Standby  Chilled Water  Pumpsets Group Consultant Intl/General Contruction Contracting/Scale ElectromechanicalHotel Bldg B+G+M+3F+R DieraEbara Pumps 
82Supply and Commisioning of 409 1Duty+1 Standby Transfer and Booster Pumpset Sheikh Zayed Housing Programme / Intrl Engg Consultants/Ali Moosa & Sons409 Villas @  Al Sayouh Sharjah   Davey Pumps
83Supply and Commisioning of 108 1Duty+1 Standby Transfer and Booster Pumpset Sheikh Zayed Housing Programme / Intrl Engg Consultants/Ali Moosa & Sons108 Villas at Al Nahda – Dibba Fujairah   Davey Pumps
82Supply and Commisioning of 174 1Duty+1 Standby Transfer and Booster Pumpset Sheikh Zayed Housing Programme / Intrl Engg Consultants/Ali Moosa & Sons174 Villas at Al Nahda – Dibba Fujairah   Davey Pumps
84Supply and Commisioning of 2Duty/1Standby  Water Booster Pump Set, 1Duty/ 1Standby Transfer Set & Submersible Drainage PumpsSorouh/Dewan Consultant / System Contracting/Al Sabbah EMWRepton School / Abu DhabiLowara Pumps 
85Supply and Commisioning of 2Duty/1Standby  Water Booster Pump Set, 2Duty/ 1Standby Transfer Set & Submersible Drainage PumpsCommand Of Military Electron Electromechanical/ RAK Consultant Khalifa Al Fahad ContractingArmed Force Staff Accomedation G+M+4F+R RAKGrundfos Pumps 
86Supply and Commisioning of 2Duty/1Standby  Chilled Water  Pumpsets Al Khaily Invesment/AL Arabian Arc Consultant/Al Dhafra Eng & ContAl Khaily Commercial Complex Al AinEbara Pumps 
87Supply and Commisioning of 3Duty/1Standby  Chilled Water  Pumpsets Police Project Committee (Secure), Morgan Consulting Engg/Tasneem Gen Contracting Fertility Center Al AinCrane Pumps 
88Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set,  1Duty/ 1Standby Transfer Set & Submersible Drainage PumpsNaresco Contracting LLC/ Design centre2B+G+6+R Bldg AL Barsha 1stLowara Pumps
89Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set  1Duty/ 1Standby Transfer Set & Submersible Drainage PumpsNaresco Contracting LLC/ Chawla Consultant4B+G+14 Bldg Nad Al ShibaGrundfos Pumps
90Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set  1Duty/ 1Standby Transfer Set & Submersible Drainage PumpsNaresco Contracting LLC/ Al Asri Eng ConsultantB+G+7+R AL MankhoolGrundfos Pumps
91Supply and Commisioning of 1Duty/1Standby  Water Booster Pump Set  1Duty/ 1Standby Transfer Set Uni Estate/ Electron Electromechanical/ Coeval Consultant / Azuri ContractingB+G+28 AL Thuraya Tower RAKGrundfos Pumps
92Supply  & Commisioning of 3 Primary  & 6 Secondary Chilled Water PumpsBangash Properties / 2B +G+ 24 Becoon Tower – M/s Emicool  /M/s Naresco Cont2B +G+24  Becon Tower Dubai Sport CityEbara Pumps
93Supply  & Commisioning of 3 Primary  & 3 Secondary Chilled Water PumpsM/s Utmost Properties  / M/s Arif & Bintoak / M/s Power FactorG+3 Bur DubaiEbara Pumps
94Supply  & Commisioning of 3 Primary  & 3 Secondary Chilled Water Pumps Mr Mohammed Saleh Al Menhaly/  Arc Internationa Engg Consultant /  Power FactorG+11 Deira DubaiEbara Pumps
98Supply and Commisioning of 1Duty+1 Assist + 1 Standby + 1Jockey  complete SS316 Water Booster Pump Set,  Electron Electromechanical/ Asian construction/  Morgan Consultant Command of Military works Al Ain Burks Crane Pumps
99Supply and Commisioning of 30 1Duty+1 Standby Transfer and Booster Pumpset Qatar Armed Force / Best Contracting wllQatar Armed ForceDavey Pumps
100Supply and Commisioning of 4 2Duty+1 Asssit + 1Standby Transfer cum Booster Pumpset with 1500ltrs 3nos pressure vessel for each setQatar Armed Force / Best Contracting wllQatar Armed ForceDavey Pumps
101Supply and Commisioning of 33set  1Duty/1Standby  Water Booster Pump Set with VFD panelDamac Propertise/ECC/ Al Rakha/ 33Villas Wild flower garden @ JGELowara Pumps
105Supply and Commisioning 6 (90KW) Horizontal  Split Case &  8 End Scution Chilled water pumpset,  Musanada /  HPD/ Drake & Scull International PJSCNational Rehabilitation Center , Abu DhabiWeinman Crane Pumps
106Supply and Commisioning 4 Booster Pump Set,  4 Transfer set, 2 Circulation, 1 Filtration sets. Al Tawfeeq for Development and Investment LLC  /  Dewan Archtect + Engineers / Pivot Engg & Gen Const CompanyFirst Avenue Mall and Hotel, Motor CityXylem Lowara Pumps
107Supply and Commisioning 2 Primary  & 2 Secondary Chilled Water PumpsAl Tawfeeq for Development and Investment LLC  /  Dewan Archtect + Engineers / Pivot Engg & Gen Const CompanyFirst Avenue Mall and Hotel Motor CityEbara Pumps
108Supply and Commisioning 3D+1S Booster Pump Set,  1 Transfer set, 2 Circulation, 1 Filtration sets. ALDAR/ Aecom Consultant / Al Rakha constructionAl Mamoura School Abu DhabiXylem Lowara Pumps
109Supply and Commisioning 2x2D+1S Booster Pump Set,  2 Transfer set, 2 Circulation, 1 Filtration sets. Accor Group/D&R Urban Planner Consultant /Geco Mechanical and Electrical LTDG+19, Novatel Hotel Staff Accomodation FujairahXylem Lowara Pumps
110Supply and Commisioning  3 Secondary Horizontal  Split CaseChilled Water PumpsDubai Municipalty / Archdome Consultant/ Al Thurate Al Asheel constructionAl Quoz AbattorWeinman Crane Pumps
111Supply and Commisioning  2 Primary + 3 Secondary Horizontal End  Suction Chilled Water PumpsADC Consultant / Menasco Contracting Sparkle Tower Dubai Marina Weinman Crane Pumps
112Supply and Commisioning Booster Pump Set & Circulation,Aldar Properties /Jacob Consultant / Pivot Engg & Gen Const CompanyJimi Mall Phase 2Xylem Goulds Pumps
113Supply and Commisioning Booster Pump Set & Circulation,Aldar Properties /Jacob Consultant / Pivot Engg & Gen Const CompanyJimi Mall Phase 3Xylem Goulds Pumps
114Supply and Commisioning  3 Secondary Horizontal  Split CaseChilled Water PumpsDubai Municipalty /Archdome Consulting Engineers./ Al Turath Al Aseel Cont & Elec. Mech LLC.Al Lesaily Abattoir at Al Margham, Dubai.Weinman Crane Pumps
115Supply and Commisioning   2 Booster Pump Set,  2 Transfer set,  2 Circulation, 4 Sump pumps sets. Sharjah Co /  QHC – Architects & Engineers Power Factor EMWSharjah Co-oprative Staff Accommodation Muwehla Burks/ Branes Crane Pumps
116Supply and Commisioning 3 Secondary Chilled Water Pumps & 1 Pressurization Unit Al Jaddaf Real Estate/  Kling Consult /Pivot Engg & Gen Const CompanyJaddaf Resi/ Maria Tower , Al Jaddaf DubaiWeinman Crane Pumps
117Supply and Commisioning 8 Secondary Chilled Water Pumps & 2 Pressurization Unit Denube Properties/  Edmac Consult/ Naresco Contracting -Al Madean EMC  Glitz Denube 1 & 2 Tower ,  Dubai Studio cityEbara Pumps
118Supply and Commisioning 8 Secondary Chilled Water Pumps & 2 Pressurization Unit Denube Properties/  Edmac Consult/ Naresco Contracting -Al Madean EMC  Glitz Denube 3 & 5 Tower ,  Dubai Studio cityEbara Pumps
119Supply and Commisioning 8D+1S Booster Pump Set,  4 Transfer set, 8 Circulation, 2 Filtration sets, 4 Sump pumps sets.  Dewa/Archdome Consultant/Ali Moosa & Sons Contracting /  G+1+5 Staff Accomodation Building Jebel Ali Grundfos Pumps
120Supply and Commisioning of 306 1Duty+1 Standby Transfer, Booster Pumpset, Circulation, Irrigation Pumpset Sheikh Zayed Housing Programme /Al Thurate Consultants /Ali Moosa & Sons/ 306 Villas  for Sheikh Zayed Housing Programme at Ajman  – Ajman  Davey Pumps
121Supply and Commisioning 6 (30KW) End Scution Chilled water pumpset, Safeer Groups/ TabreedRak Safeer MallEbara Pumps
122Supply and Commisioning 1Booster Pump Set,  1 Transfer setAl Ghurair Properties/ Arab contractors/  Al Turate Engineering G+4 Humriah Resi building / Al Ghurair PropGrundfosPumps
123Supply and Commisioning 1Booster Pump Set,  1 Transfer setAl Ghurair Properties/ Arab contractors/  Al Turate Engineering G+3 Humriah Resi building / Al Ghurair PropGrundfos Pumps
124Supply and Commisioning 4 Primary  & 3 Secondary Chilled Water Pumps + Pressurization UnitMERAAS /  Dewan  / SNC Al Thowima Resi BarshaEbara Pumps
125Supply and Commisioning 2D+1S Booster Pump Set,  2 Transfer set, 2 Circulation, 1 Filtration sets. AL Asri Consultant /Prime constructionB+G+15 Resi Building Dubai Silicon OasisGrundfos Pumps
126Supply and Commisioning  4 Primary  & 3 Secondary Chilled Water PumpsSharjah Co / QHC – Architects & Engineers/ Power Factor EMWSharjah Co-oprative Staff Accommodation Muwehla Weinman Crane Pumps
127Supply and Commisioning  3 Secondary Horizontal  Split CaseChilled Water PumpsDubai Municipalty / Archdome Consultant/ Al Thurate Al Asheel constructionMargham  AbattorWeinman Crane Pumps
128Supply and Commisioning  3 Secondary Horizontal  End Suction Chilled Water Pumps with Control panel _ Pressurization Uunit  Al Shafar Development/Arc/ SNC G+ 4 Resi & Commercial Building Dubai LandEbara Pumps
129Supply and Commisioning Plumbing Pumpset Al Takamul Al Handasa Consultant/AL Khamas GroupG+1P+7 Resi Bld, Warsan 4th Grundfos  Pumps
127Supply and Commisioning  11  Horizontal  Split CaseChilled Water Pumps Al Taif Investment/Dewan Consultant/China State Contruction/  Fujeirah Business Centre Ebara Pumps
128Supply of Booster, Transfer & Sump  PumpsTransco /AL Dhafra Eng & Cont CoRefurbishment of Civil Works For 132/220/400 KV Substation,  Pumping Station And CablesKSB / Grundfos Pumps
129Supply of Chilled Water PumpCommand Of Military Works  /AL Dhafra Eng & Cont CoUrgoub Al Thuraya Military ChampKSB  Pumps
130Supply and Commisioning of 2Duty +1 Standby  Chilled Water Pump Naresco Contracting LLC/ Al Asri Eng ConsultantB+G+7+R AL MankhoolEbara Pumps
131Supply and Commisioning of3Duty +1 Standby  Chilled Water Pump Ajmal Group, Naresco Contracting LLC/ Al Asri Eng ConsultantB+G+34+R Ajmal Saraya Dubia LandGrundfos Pumps